GC SurgeDokumentation

Diese Seite ist noch nicht auf Deutsch verfügbar, Sie lesen daher das englische Original. Auf Englisch bleiben

Rollout Progress

Auf dieser Seite
  1. Summary
  2. Metrics
  3. How to interpret it
  4. When to act

Summary

Rollout Progress summarizes deployment health for the account using site-onboarding and device-connectivity counts and percentages.

Metrics

  • Sites onboarded — sites that completed the onboarding process.
  • Devices connected — cameras or devices currently connected across those sites.

How to interpret it

A high site-onboarding percentage with a low device-connectivity percentage usually means the site records exist but devices are not yet streaming or are offline.

A complete rollout requires both the intended sites and their expected devices to be active.

When to act

Investigate device credentials, network connectivity, device status, and alarm forwarding when connected-device progress trails site onboarding. Confirm the expected device count for each site before treating the rollout as complete.

Was this page helpful?

Thank you — your feedback goes to the team that owns this page.

Versionshinweise

Erfahren Sie, wann etwas ausgeliefert wird

Neue Funktionen, Korrekturen und Integrations-Updates für GC Surge — direkt in Ihr Postfach, sobald sie veröffentlicht werden.

Wir senden zuerst einen Bestätigungslink. Jede Nachricht enthält einen Abmeldelink.